Main Office Refurbishment

Aerodrome Primary Academy

Refurbishment works were undertaken the main school office during a half term week. The existing office area was enlarged and re-designed following removal of a corridor wall and reconfiguring doorways.

A new suspended ceiling was installed and existing light fittings were upgraded to suit the new layout and specific work station positions. Purpose made storage units were manufactured and installed including a new tea station.

The existing reception counter was enlarged with a new sliding glazed screen to provide a more welcoming entrance to the reception.

New floor covering were laid as well as redecorations and alterations to the existing IT services to suit the new area.